The complete process inspection standards for the factory's finished products ---1.Raw material incoming inspection and Laminating particle detection

Published on:

2026-07-21 15:35

.Raw material incoming inspection (first quality control checkpoint before production; non-conforming materials are not processed) 

1. Paper cup base paper testing.
2. Verify qualifications: supplier's food-grade test report, factory certificate of conformity, and batch number; 
3. Visual inspection: No holes, mold spots, oil stains, black dust, or water marks; 
4. Fluorescence test: Under fluorescent lighting, no optical brighteners detected; 
5. Physical sampling inspection: weight, stiffness (crosswise/longitudinal), water absorbency, moisture content, brightness; 
6. Safety inspection: Sampling and testing for heavy metals such as lead and arsenic.

.Laminating particle detection(PE)
1.Qualification verification: Food contact grade certificate, GB4806.7 test report; 
2. Appearance: The particles are uniform, free of impurities and blackened recycled material particles. 
3. Conducting random tests on melt index to ensure the stability of film coating formation; 
4. The recycling and reprocessing of plastic particles is strictly prohibited. 
3. Auxiliary material testing (heat sealing aid, lubricant) 
Check the GB9685 license list and there are no prohibited additives.

Latest Blog

Online inquiry

We will contact you within one working day. Please pay attention to your email.

Online inquiry