The complete process inspection standards for the factory's finished products--5.Final inspection before shipment

Published on:

2026-07-22 15:08

Final inspection before shipment (the last check before loading, to prevent incorrect delivery and mixed batches) 


Order information verification
1.Customer product name, weight per piece, single/double lamination, PE, roll/cup sheet, weight, quantity. Ensure no wrong material specifications are delivered. 
2. Outer packaging inspection
The moisture-proof wrapping film is intact, the paper tube has a protective edge, the packaging is rainproof, and the labels are clear; for export goods, moisture-absorbing desiccants are added. 
3. Randomized sample review
Randomly open one roll for rapid re-inspection: fluorescence, laminated surface (both sides), presence of leakage; 
4. Document-based Outbound Delivery
Included with the goods: Factory self-inspection report, certificate of conformity; For foreign trade customers, additional documents include third-party test report, PFAS report, and conformity statement; 
5. Loading and Unloading Monitoring: Prevent damage caused by squeezing during loading and unloading. Take appropriate rain protection measures in rainy weather.

Latest Blog

Online inquiry

We will contact you within one working day. Please pay attention to your email.

Online inquiry